Project
Citibank Building Level 10
Completion Date December 2024
The previous 650m² office fit-out has been removed and the base build has been reinstated in preparation for a new office fit-out. The space now features a suspended ceiling, oak veneer boxes along the perimeter and polished concrete floors and columns.